Frequently Asked Questions

What is the average build time?

Our build time is 8-10 weeks, but there are other factors, such as site setup, geotech soil testing and services to be connected. We like to think from signing of contract to building being on site, 10-16 weeks.

Can we change things on the plan?

Of course. We have a base plan which the specs can be changed on, such as interior/exterior linings, colour, floor coverings, light fittings etc. we can either have a mono pitch or gable roof.

Can we change things on the plan?

Of course. We have a base plan which the specs can be changed on, such as interior/exterior linings, colour, floor coverings, light fittings etc. we can either have a mono pitch or gable roof.

Are the buildings easy to transport?

Yes our buildings are made to be easily transportable, which has made transporting cost effective. Our building sizes and design of our floor makes transporting efficient.

What has to be done once building is on site?

Once the building is delivered on site services are connected. (power, plumbing, waste/stormwater). Extras are completed such as decks, landscaping etc. It is a very simple process and is completed in only a few days.

Are there any costs associated with the build?

Extra costs to factor in on top of the build include

  • Transport
  • Footings/piles for steel foundations to sit on, all sites are different and a geotech report will confirm what has to be done.
  • Services (power, plumbing, stormwater).
  • Driveway/site prep.
  • Decking and stairs
  • Landscaping if required


Talk to us about customised plans

Don’t see what you are after? Talk to us about creating a customised plan that will suit your needs.

Card image cap
2 Bedroom
Card image cap
3 Bedrooms
Card image cap
Cabin